Quick answer
- Thai FDA cosmetic notification takes 7–14 business days in our process, counted from the day you confirm your logo and label artwork — not from your first enquiry.
- Notification sits in the middle of the job, not at the end: the full line from formula selection to delivery runs about 27–38 business days, roughly 5–8 weeks.
- The filing is free when you produce 200 units or more with us, a 2,500 baht value, and it is tied to a production order rather than being a stand-alone service.
Who needs to notify a cosmetic product?
Any product classified as a cosmetic and sold in Thailand must have a notification in place before it goes on sale. The party responsible for filing is the product owner or brand owner — not the manufacturer by default.
In practice, most of our clients notify under their own brand name, and the factory prepares and submits the dossier on their behalf. That service is included when you produce your brand with us. The document you receive at the end of this step is the Thai FDA cosmetic notification certificate; that is the only document involved in the notification step itself.
If you are not sure whether your concept counts as a cosmetic, tell our team the product format and how it is used from the very beginning. A wrong classification at the start means reworking the whole set later, and rework is the most expensive kind of delay because it happens after you have already waited.
How long does Thai FDA cosmetic notification take?
7–14 business days is the window for registering the cosmetic under your brand, counted from the day you confirm the logo and label artwork.
We quote a range rather than a single figure because three things move the number: how complete the submitted information is, how many items are filed at once, and where the authority’s queue stands at that moment. When everything arrives complete and nothing needs correcting, work usually lands near the lower end of the range. If an item has to be revised, it moves up.
What you should plan around is this: notification sits in the middle of the process. It is not the first step and it is not the last. So the clock does not start on the day you first send us a message, and it does not stop when the certificate lands — production still has to run after it.
Two consequences follow from that, and both are practical:
- Everything that feeds the filing — product name, category, formula, responsible person, fill size — has to be locked before the 7–14 day window is useful to you.
- A launch date built on the notification window alone will slip. Build it on the full sequence instead.
What information and documents do I need to prepare?
There is no fixed public checklist we can hand out, because the list depends on the product category and the filing format in use at the time, and a table that is out of date is worse than no table. What we can tell you is the six groups of information you should have ready from the outset:
- Brand name and the product name you will actually use, including any foreign-language version.
- Product category and intended use — face, body or hair.
- The formula and ingredients to be produced; the factory prepares these from the formula actually manufactured.
- Details of the responsible person and the manufacturing site, which our team checks for accuracy.
- Label artwork that has been confirmed, because the label wording must match the filed information.
- Packaging details and fill size.
The single biggest time-saver is to settle the product name before this step begins. Changing a name or label wording after submission usually means redoing the whole set. If you have an in-house design team, have them work alongside the notification team from the label design stage rather than handing over a finished file at the end — most mismatches between label and filing are created in that handover, not in the filing itself.
The full sequence: 27–38 business days
Laid end to end, notification is only one stretch of the process. The complete sequence runs as follows:
| Step | What happens | Time |
|---|---|---|
| 1 | Choose a product from the company’s standard formulas and trial it before production | Before the clock starts |
| 2 | Set the order at the 200-unit minimum, select packaging, receive a quotation | Before the clock starts |
| 3 | Pay as agreed, then logo and label design | 3–7 business days |
| 4 | You confirm the logo and label artwork | Your decision, no fixed duration |
| 5 | Registration of the cosmetic under your brand | 7–14 business days |
| 6 | Production, starting after the actual sticker is approved | No more than 14 business days |
| 7 | Pay the balance, then delivery | Within 3 business days of the payment date |
| Total | From confirmed artwork and first payment to delivery | 27–38 business days, roughly 5–8 weeks |
The total is roughly 27–38 business days, or about 5–8 weeks, from the day the artwork is confirmed and the first installment is paid. Steps 1, 2 and 4 have no fixed duration because they are waiting on choices rather than on work — and they are where most of the variance in the estimate actually lives.
If you have a fixed selling date — a trade show, a promotion window — count back 38 business days from that date and see when you need to start talking to a factory. If that day has not arrived yet, start gathering formula and packaging information now.
Is FDA notification free when you produce 200 units or more?
Yes. The notification fee is a cost that new brand owners routinely leave out of their budget, and under our promotion, brands producing 200 units or more with us receive cosmetic notification with the Thai FDA free of charge, a value of 2,500 baht.
Three more items come with the same job: five pre-production tester runs, two botanical extracts, and design of the box, sticker and packaging. Free items follow the promotion available at the time and may change without prior notice.
One point worth being clear about: this free item is tied to the 200-unit threshold and is not a stand-alone service you can request without placing a production order. If you need notification only, without production for now, tell our team so it can be assessed case by case — but plan on the assumption that the free version comes with the production order, not before it.
What are the most common mistakes that cost the most time?
Four mistakes account for most of the lost time in notification work.
The product name and label wording are not final, yet the filing is rushed through anyway. The result is rework, and more lost time than expected — usually more than waiting a week to settle the name would have cost.
A beautiful label whose information does not match the filing — a product name spelled with one letter different, or a category that does not match the real use. The label and the notification must be one set.
Assuming notification can start before the formula and packaging are chosen. The filed information is based on what is actually produced, so lock the formula and fill size first.
Building in no buffer at all and planning the launch right up against the delivery date, even though the full line takes 27–38 business days and there are stretches where the process is waiting on your decision rather than on work.
All four have the same shape: a decision that could have been made earlier gets made later, after something has already been submitted. The filing is not slow; the inputs arrive late.
How do I plan a launch date around these numbers?
Work backwards, not forwards. Take your fixed selling date and subtract 38 business days. That is the latest date you should be talking to a factory. Subtract 27 business days to see the earliest realistic start.
If your date is inside that window, the honest answer is that the date needs to move or the scope needs to shrink — not that the process can be compressed. Notification timing depends partly on the authority’s queue, which is outside anyone’s control, so a plan that assumes the fast end of every range is not a plan.
Three things you can do before the clock starts, and they cost nothing but attention:
- Decide the product name and keep it fixed once the filing begins.
- Lock the formula and the fill size before anyone prepares paperwork.
- Keep one decision-maker on the label so feedback does not bounce between departments.
If you are still choosing between formats, ask our team what each one needs before you commit. That conversation takes minutes and can save a full rework cycle.
Talk to our OEM team
Want to know what your product will need, and whether it can make your launch date?
Call 093-593-9929 or add LINE @ARGOSY for a free consultation. Our team replies Monday–Saturday, 09:00–18:00.
Or send the details to [email protected] — product format, intended use, target quantity and your selling date are the four things that let us answer with real numbers instead of a range.
Related articles
FAQ
How many days does Thai FDA cosmetic notification actually take?
7–14 business days in our process, counted from the date the label artwork is confirmed. Where it lands inside that range depends on how complete the information is and how many items are filed at once.
Does notification come before production, or after?
Before production. In our sequence, design and label confirmation come first, then registration, then production — because the label wording has to match what was filed.
When does the clock actually start?
On the day you confirm the logo and label artwork. Formula, order quantity, packaging and the quotation all have to be settled before that, so the 7–14 business days do not start on the day you first message us.
What document do I get back?
The cosmetic notification certificate from the Thai FDA. That is as far as we can state it for this step; if you need a specific document for your project, raise it with our team in advance so it can be reviewed case by case.
Is the free notification with a 200-unit brand real?
Yes. Brands producing 200 units or more with us receive cosmetic notification with the Thai FDA free of charge, a value of 2,500 baht. Free items follow the promotion available at the time and may change without prior notice.
Can I get the notification without placing a production order?
Not as the free promotion item — that one is tied to the 200-unit threshold. Notification-only enquiries are assessed case by case, so tell our team what you need and they will confirm.
What delays a filing the most?
A product name or label wording that is not final when the filing goes in. Changing either after submission usually means redoing the whole set, which costs more time than settling the name first would have.
How long is the whole project, not just the filing?
About 27–38 business days, roughly 5–8 weeks, from the day the artwork is confirmed and the first installment is paid to the day the goods are delivered.
Talk to our OEM team
Call 093-593-9929, add LINE @ARGOSY, or email [email protected] — we reply Monday–Saturday, 09:00–18:00 (ICT).
Related articles
- ISO 22716 vs GMP vs ASEAN GMP: What Is the Difference?
- Cosmetic OEM Cost Breakdown: What a Five-Figure Budget Really Covers
- Cream OEM MOQ: 100 vs 200 Units — Which One Is Worth It?
- What Does a 200-Piece MOQ Mean? Minimum Order Quantity for Cosmetic OEM
Useful pages
Free items, including cosmetic notification with the Thai FDA, follow the promotion available at the time and may change without prior notice.
This article is written to support a brand-launch decision. Regulatory requirements and processing times may change — please confirm with the relevant authority before you proceed.